Monday, March 31, 2014
Wednesday, March 19, 2014
Bathroom Details
Top left: New vent and shower head.
Top right: New outlet. Power surge trouble with the old one.
Bottom left: Toilet and sink re-installed.
Bottom right: Double switch. One for light and one for vent.
Top right: New outlet. Power surge trouble with the old one.
Bottom left: Toilet and sink re-installed.
Bottom right: Double switch. One for light and one for vent.
Monday, March 17, 2014
Vent
The guys came today to make a hole in the floor on the second level where the vent for the bathroom will go.
Sunday, March 16, 2014
Front Door (Living Room Side)
Labels:
2010's,
2014,
front door,
Joe,
living room,
St. Patrick's Day
Subscribe to:
Posts (Atom)